Installation
E19-310DC
Combination Drench Shower/Eyewash
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . .2
Installation Instructions . . . . . . . . . . . . . . . . . . . . . .3
Assembly of Components . . . . . . . . . . . . . . . . . . . .4
Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
215-163DCE Rev. Z; EN 06-532F
© 2007 Bradley Corporation
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 1-800-BRADLEY FAX (262) 251-5817
Page 1 of 5
6/25/07
Installation
E19-310DC
Installation
Ø 273mm
(10-3/4")
Supplies Required:
247mm
(9-3/4")
• (3) M10 floor anchors and bolts
Ø 229mm (9") Flange
• Teflon tape and pipe sealant
• Piping to 1-1/4" BSP water supply inlet on unit
• Adequate supply pipe supports
with (3) Ø 10mm (3/8")
Holes on Ø 203mm (8")
Bolt Circle
• Piping to 1-1/4" BSP drain outlet for eyewash
267mm
(10-1/2")
• Minimum 102mm (4") drain to accommodate
115 liters (30 gallons) per minute discharge for
shower waste
Use Teflon
Tape Only
645mm
(25-3/8")
• OPTIONAL: sign-mounting hardware
133mm
(5-1/4")
Step 1: Secure base to floor
1. Install three suitable anchors (by installer)
for M10 bolts in the floor (see Figure 1).
610mm
(24")
2. Bolt the base to the floor anchors using M10
bolts (supplied by installer).
Ø 254mm
(10")
1676mm
IMPORTANT: Some teflon sealants
may cause stress cracks in the plastic
showerhead leading to failure. Use
teflon tape for sealing the showerhead.
(66")
To
Floor
2160mm
(7'-1")
To
Floor
229mm
(9")
140mm
(5-1/2")
Step 2: Assemble eyewash components
1. Assemble the remaining unit components as
shown in Figure 2 on page 4.
• Apply pipe sealant (supplied by installer) to
all male-threaded pipe joints.
1041mm
(41")
• Use the rubber grip pad provided or a strap
wrench around pipes when tightening to
prevent marring. Place the grip pad on the
pipe, then put the wrench over the grip pad
and turn the pipe with the wrench.
152mm
(6")
• Bottom edge of showerhead should be
2160mm (7'-1") from floor.
NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow
for +/- 1/8" (3mm) per threaded joint. To find
the tolerance of a dimension, add the number
of thread joints in between a dimension and
multiply it by 1/8" (3mm).
Step 3: Connect water supply
IMPORTANT: Do not rely on Bradley’s
Combination Unit to support supply
piping.
1. Connect water supply piping to 1-1/4" BSP
inlet on unit (piping supplied by installer).
Provide adequate supports (supplied by
Figure 1
installer) for supply pipe using pipe hangers or other means.
2. Connect drain piping to 1-1/4" BSP drain outlet on unit (piping supplied by installer).
3. Hang the safety sign from the unit with the curtain hooks provided (or mount it to the wall using
sign-mounting hardware supplied by installer).
Bradley Corporation • 215-163DCE Rev. Z; EN 06-532F
6/25/07
3
E19-310DC
Installation
Assembly of Components
NOTE: If tee (Item 7) is used as a supply
inlet, use plug (Item 7) on tee (Item 2).
7
BSP threads this end
6
8
1-1/4" BSP Supply Inlet
2
9
(BSP threads are noted
with black line on threads)
5
9.2
9.1
19
11
9.3
9.4
15.4
Flow
Control
This End
5
12
9.5
9.11
15.3
13
15.2
NOTE: Use
teflon tape
only.
14
10
17
16
14.1
14.2
18
15.1
4.12
4.4
14.3
4.2
4.12
4.7
4.1
4.6
4
4.3
4.5
4.71
4.10
4.2
22
4.11
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
114-052
4.9
HANDLE NOTE:
Close the cover
and put the pin
through the clip
to keep closed.
23
R
P
.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄ 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
T
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il
y
à
quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date
Signed
Signed
Signed
3
21
20
1-1/4" BSP
Drain Outlet
2
1
NOTE: Items 4.1–4.12 come preassembled as Item 4.
Items 9.1–9.5 come preassembled as Item 9.
Figure 2
Items 14.1–14.3 come preassembled as Item 14.
4
6/25/07
Bradley Corporation • 215-163DCE Rev. Z; EN 06-532F
Installation
E19-310DC
Parts List
Item Part No.
Qty
1
2
1
1
1
2
1
1
1
1
1
1
1
1
1
1
3
2
1
1
1
1
1
1
1
Description
Item Part No.
9.3 124-048
Qty
1
1
1
1
1
1
2
1
1
1
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Description
Washer, Friction
Handle
1
2
3
4
131-059
Base
169-727B
113-006LC
S39-226
Pipe Tee 1-1/4" NPT
Pipe 1-1/4" NPT x 706 mm
Europe Eyewash Sub-Assy.
Inlet Drain Fitting
9.4 128-129
9.5 142-002DC
Lockwasher
10
11
12
13
14
128-156A
113-006LK
169-723
Pull Rod - 24" Long
Pipe 1" NPT x 310 mm
90° Street Elbow 1" NPT
Curtain Hook
4.1 111-039
4.2 169-025
4.3 S06-136
4.4 169-841
4.5 142-002DA
4.6 169-726
4.7 S27-282
4.71 110-215
4.8 113-006QX
4.9 169-764
4.10 113-006LE
4.11 169-727
4.12 113-006LQ
Street Elbow
Plgd. Nipple 1-1/4" NPT x 76mm
Reducing Tee
151-001
S24-070
Showerhead Assembly
Showerhead Shell
Diffuser
Lockwasher
14.1 154-057
14.2 155-005
14.3 160-245
Union 1/2" Female NPT
1/2" Ball Valve with Nut
Jam Nut only
Screw
15
S45-1782
Cup Strainer Prepack
Center Seal Gasket
Cup Strainer
Pipe 1-1/4" NPT x 180mm
90° Pipe Elbow 1-1/4" NPT
Pipe Nipple 1-1/4" NPT x 76mm
PIpe Tee 1-1/4" NPT
Pipe 1/2" NPT x 76mm
Pipe 1-1/4" NPT x 579 mm
Reducing Tee
15.1 124-028
15.2 173-009
15.3 S21-071
15.4 113-1159
Stem Pipe Assembly
Spacer, Drain
16
17
18
19
20
21
22
23
24
S90-009
269-447
161-025
S05-091
S08-056
153-372R
204-421
114-052E
269-915
Dust Cover Assembly
Bumper
5
6
7
8
9
113-006LW
169-722B
169-724
Nut
Pipe Plug 1-1/4" NPT
Pipe 1" NPT x 234 mm
Stay-Open Ball Valve 1" NPT
1" Ball Valve with Jam Nut
Jam Nut only
Eyewash Yoke
Handle Assembly
Adapter
113-006LL
S30-059
9.1 S27-278
9.11 110-214
9.2 140-720
Emergency Tag
Safety Sign
Stop Bracket
Grip Pad (not shown)
Prepack S30-087 includes Items 4.71, 4.5, 20
Bradley Corporation • 215-163DCE Rev. Z; EN 06-532F
6/25/07
5
|